Not sure, but I think this is weekend #2 of framing the walls. We were able to get up the majority of the left side as well as install the headers for the two entrances. The rear entrance is much taller than the front since the floor will be raised almost 15″ in the rear half.

Next up are the mid-sections. See those wide boards on the floor? Those are to span the wheel wells and are incredibly awkward (a 1/2″ thick piece of ply glued between two 2×12’s)!