At this point we have the roof sheathed, hurricane straps installed, and four of our windows framed. Progress seems to be slowing a bit in the warmer months. The weather in the shop at 14′ is completely different than being outside. Could be the AC from the office pumping hot air into the shop floor or the metal roof but, wow!